In industrial production, HVAC systems, power plants, and chemical facilities, a cooling tower is an essential heat-dissipation device. When companies expand capacity, upgrade facilities, or build new plants, they often need to plan, design, and construct a suitable cooling tower system—from civil foundations to equipment installation and commissioning.
This article explains how to build a cooling tower step-by-step, from engineering planning to final operation. It also provides practical advice based on experience from MACH Cooling (https://www.machcooling.com/).
Note: Actual structural design, load calculations, safety, environmental, and compliance work must be done by certified engineering institutes and manufacturers. This article serves as technical guidance only.
Before "building" a cooling tower, you must understand the required cooling capacity. Key parameters include:
Circulating water flow rate (m³/h): e.g., 300 m³/h, 1000 m³/h
Inlet/Outlet water temperature (°C): e.g., 37°C → 32°C
Local summer design wet-bulb temperature
Water quality: impurities, hardness, treatment requirements
Application scenario: industrial cooling, HVAC, steel plants, chemicals, power stations
Installation environment: rooftop, ground level, seaside, desert, high-temperature regions
These determine tower model selection, size, materials, fan system, and performance.
Manufacturers such as MACH Cooling can help evaluate these parameters and provide professional design recommendations.
Based on project requirements, typical choices include:
Open cooling tower – suitable for most industrial/HVAC applications
Closed-circuit cooling tower – ideal for high water-quality or contamination-sensitive systems
Hybrid cooling tower – combines open + closed technologies for higher efficiency
Crossflow / counterflow / side-draft structures
Single or multi-cell configuration
Manufacturers like MACH Cooling can provide comparative technical solutions.
Once the type is decided, deep technical discussions must follow, covering:
Tower model, dimensions, height
Materials (FRP, galvanized steel, stainless steel, Mg-Al-Zn coated steel, etc.)
Fan, motor, gearbox or direct-drive system
Fill media type (PVC, PP, high-temperature types)
Water distribution system, spray coverage
Noise control, energy-saving VFD systems
Optional: drift eliminators, anti-freezing solution, enhanced corrosion protection
| Item | Example | Notes |
|---|---|---|
| Circulating water flow | 800 m³/h | Two cooling tower cells |
| Inlet water temperature | 37°C | |
| Outlet water temperature | 32°C | |
| Wet-bulb temperature | 27°C | Local summer design value |
| Application | HVAC + process cooling | |
| Installation location | Ground beside building | Noise control needed |
| Noise requirement | ≤ 65 dB(A) @ 1 m | Near office area |
| Budget | XX USD | Preliminary |
| Manufacturer suggestion | MACH Cooling open counterflow tower | Includes VFD option |
Cooling towers require structural design considering dead load + water load + wind load + seismic load. Common foundation types:
Reinforced concrete strip foundation
Reinforced concrete independent foundation + embedded steel beams
Rooftop steel structure foundation (capacity must be verified)
Manufacturers such as MACH Cooling provide tower weight, load distribution, center of gravity, and layout drawings for civil design.

During civil works, ensure provisions for:
Inlet/Outlet piping (commonly DN200–DN800 or larger)
Overflow, drain, and makeup water ports
Maintenance walkways and platforms
Supports, ladders, guardrails, anti-vibration devices
Good civil planning reduces rework and improves system reliability.
After confirming the design, sign a detailed technical agreement. With MACH Cooling, verify:
Cooling performance: flow, inlet/outlet temperature, airflow
Material specification: tower casing, steel structure, bolts, fill, fan blades, pipes
Anti-corrosion treatments
Noise limits, energy-consumption limits
Warranty period and after-sales response time
Delivery schedule and installation guidance
Manufacturing typically includes:
FRP panel forming, drilling, trial assembly
Steel structure welding, galvanizing, coating
Fill media stamping and modular packaging
Fan, motor, gearbox assembly and run tests
Nozzles, water basins, ladders, accessories fabrication
Some manufacturers conduct pre-assembly and performance checks before shipping.
Manufacturers usually send technicians for installation supervision. Typical steps (open counterflow tower):
Foundation acceptance
Installation of bottom steel structure
Casing panel assembly
Fill and fill support installation
Water distribution system installation
Fan + motor installation and alignment
Electrical wiring + control panel connection
Pipework connection
Safety equipment installation
A cooling tower is part of a circulating cooling-water system, requiring:
Cooling tower connected to circulation pump, heat exchanger, process equipment
Installation of valves, filters, bypass lines, vents, drains
Integration with automatic control:
Level switches/sensors
Temperature sensors
VFD fan speed control
Alarm and interlock logic
Example: When return water temperature rises, the VFD speeds up the fan automatically.
| Item | OK (√/×) | Notes |
|---|---|---|
| Foundation level & dimensions | ||
| Anchor bolts position | ||
| Fill installation flatness | No gaps or misalignment | |
| Nozzle spray coverage | Test with water | |
| Fan direction & RPM | No abnormal vibration | |
| Motor insulation & grounding | Must be compliant | |
| Pipe connections sealed | No leakage | |
| Overflow/drain/makeup tested | ||
| Walkways & ladders installed | Complete |
After installation:
No-load test
Water filling and circulation check
Full-load test measuring actual cooling performance
Acceptance based on contractual performance requirements
Manufacturers such as MACH Cooling assist with site commissioning.
To ensure long-term stability:
Clean fill media regularly to maintain heat-transfer efficiency
Check fan blades, bearings, gearbox oil level
Maintain proper water treatment and blowdown
Implement anti-freezing measures in cold seasons
Use VFD to reduce energy consumption and equipment stress
| Task | Frequency | Notes |
|---|---|---|
| Fill inspection/cleaning | Every 3–6 months | Shorten if water quality is poor |
| Fan/motor vibration check | Monthly | Stop immediately if abnormal |
| Gearbox oil check/change | 3 months / 1 year | Follow manufacturer manual |
| Basin cleaning & blowdown | Monthly | Avoid nozzle blockage |
| Control cabinet inspection | Quarterly | Tighten terminals |
| Annual overhaul | Yearly | Adjust as needed |
Although this article explains “how to build a cooling tower,” the safest and most efficient approach is:
Let a professional cooling tower manufacturer deliver a complete engineering solution.
Working with MACH Cooling (https://www.machcooling.com/) provides:
Engineering consultation and load analysis
Complete cooling tower selection and drawings
Quality-assured tower body, fan, motor, fill media
On-site installation guidance and training
Long-term spare parts & technical support
Building a cooling tower involves:
Requirement analysis
Civil engineering design
Manufacturing
On-site installation
System commissioning
Long-term maintenance
Collect cooling conditions (use the table provided earlier)
Contact MACH Cooling and submit your data
Evaluate technical and cost proposals
Proceed with civil work, procurement, and installation
Implement a maintenance plan
With professional engineering support, you can build not just a cooling tower—but a high-efficiency, energy-saving, and reliable cooling system for your operation.